Project Details
It is about the final study for Road and interchange design, including signage for the subsection Agios Athanasios – Krinides of the section 61.5 Drama – Kavala of Egnatia Odos.
Design of highway with a total length of 11 km, including one interchange, consist of three roundabouts and service roads of sum length 14,5km.
Facts & Figures
Location
Agios Athanasios – Krinides
Client
Egnatia Odos SA
Study
Final Design of Road and Interchanges Plan, Signage and Safety Studies
Budget
25.000.000 €
Scale
> 10 km
Categories
Traffic • Transportation
Key people behind this project
Ioanna Diplari
Rural & Surveil Engineer
Apostolos Charisoudis
Rural & Surveil Engineer