Project Details
It is about preliminary and final study for motorway, interchanges as well as signage and safety for the construction of the subsection I/C Agia Marina Stylida – I/C Raches of the Skarfia- Raches section of the PATHE Motorway, Ch. 12+000 – 31+234,97.
The project concerning the 19.4km motorway, with two separate carriageways, twe lanes per direction and LEA, which bypasses Stylida, Karavomilos and Achinos with three tunnels, four viaducts, one bridge overpasses and eleven underpasses, a network of sidewalks and vertical roads on either side of the highway 33.70 km., three interchanges I/C Agia Marina Subway, I/C Stylida – Karavomilou and I/C Karavomilou.
Three at grade intersections and complete signage and safety study for the whole project.
Facts & Figures
Location
Agia Marina, Stylida – Raches
Client
Transportation Ministry - Special Public Works Service for PATHE Motorway
Study
Final Design of Roadworks, Signage and Safety
Budget
200.000.000 €
Scale
> 10 km
Categories
Traffic • Transportation
Key people behind this project
Ioanna Diplari
Rural & Surveil Engineer
Apostolos Charisoudis
Rural & Surveil Engineer