Project Details
Road viaducts carrying two independent branches of motorway, with a total length of 350m, a width of 14,2m each, and a maximum pier height of 58m. Continuous superstructures of prestressed concrete single-cell box girder of variable depth, rigidly connected to the piers, constructed with the balanced cantilever method. Bridge piers are founded on cylindrical shafts.
Facts & Figures
Location
Panagia - Grevena
Client
Egnatia Odos SA
Scale
< 10 km
Study
Structural Study
Budget
18.950.000 €
Categories
Infrastructure
Key people behind this project
Ioannis Tegos
Civil Engineer
Athanasios Tzanavaris
Civil Engineer
Panagiotis Digkas
Civil Engineer