New business

Career opportunities

General inquiries

  • METESYSM SA
  • Leontos Sofou 20, Thermi
  • 570 01, Thessaloniki, Greece
  • T +30 2310 402 300
  • F +30 2310 402 322

Road Viaducts G2

Road Viaducts G2

Project Details

Road viaducts carrying two independent branches of motorway, with a total length of 350m, a width of 14,2m each, and a maximum pier height of 58m. Continuous superstructures of prestressed concrete single-cell box girder of variable depth, rigidly connected to the piers, constructed with the balanced cantilever method. Bridge piers are founded on cylindrical shafts.

Facts & Figures

Location

Panagia - Grevena

Client

Egnatia Odos SA

Scale

< 10 km

Study

Structural Study

Budget

18.950.000 €

Categories

Infrastructure

01_plan&section1_4-3
02_section5_4-3
03_section7_4-3

general plan, section

sections

section detail

Key people behind this project

Ioannis Tegos

Civil Engineer

Athanasios Tzanavaris

Civil Engineer

Panagiotis Digkas

Civil Engineer

Contact

New business

Career opportunities

General inquiries